First Article Inspection (FAI): Complete Guide for Sheet Metal Parts

Master First Article Inspection for sheet metal parts. Learn about FAI requirements, planning, documentation, and best practices for new product validation.

Introduction

First Article Inspection (FAI) is a comprehensive verification of the first part produced from a new or modified design. It confirms that the manufacturing process can produce parts that meet all requirements. At Fulei Metal, we perform FAI for every new product to ensure quality from the start.

What is First Article Inspection?

Definition

FAI is a complete inspection of the first part or parts produced using a new manufacturing process, new design, or modified process. It verifies that all dimensional, material, and functional requirements are met before production continues.

Dimensional check recorded against the enclosure drawing
First-article inspection measures every feature on the drawing and records it — it is not a sample, and it is not repeated by assumption on the next batch.

Purpose

Verify manufacturing process: confirm the process can produce conforming parts. Verify product design: confirm the design is manufacturable and meets requirements. Verify tooling and fixtures: confirm tooling produces correct parts. Establish baseline: create reference for future inspection. Customer approval: provide evidence for customer source approval. Prevent production of non-conforming parts: catch problems early.

When FAI is Required

New product: first production run. Design change: modification to part design. Process change: new manufacturing method or equipment. Tooling change: new or modified tooling. Material change: different material grade or supplier. Location change: production moved to different facility. After extended production break: resuming production after gap. Customer requirement: customer specifies FAI frequency.

FAI Planning

FAI Procedure

Document the FAI process. Define: what to inspect, how to inspect, acceptance criteria, documentation requirements, who performs inspection, who approves results.

Identification of Characteristics to Inspect

All dimensional characteristics: every dimension on the drawing. All geometric tolerances: flatness, perpendicularity, position, etc. All material requirements: grade, properties, certification. All surface finish requirements: roughness, coating, treatment. All functional requirements: performance tests if applicable. All marking and labeling requirements. All special requirements: customer-specific, regulatory.

Inspection Plan

Create detailed inspection plan. List each characteristic: feature description, nominal value, tolerance, measurement method, measurement tool, acceptance criteria. Sequence: plan measurement order for efficiency. Assign: inspector, equipment, estimated time.

Resource Preparation

Ensure: measurement equipment available and calibrated, inspection fixtures available, material certification available, drawing and specification current, FAI form or software ready, qualified inspector available.

FAI Process

Step 1: Produce First Article

Manufacture the first part using the production process. Use production tooling, equipment, and procedures. Document production parameters. Ensure process is set up correctly.

Step 2: Verify Material

Verify material certification matches specification. Verify material grade and properties. Verify heat number traceability. Record material certification reference.

Step 3: Dimensional Inspection

Inspect all dimensions on the drawing. Use appropriate measurement tools. Record: nominal, tolerance, measured value, result. Use CMM for complex geometries. Verify all geometric tolerances.

Step 4: Visual Inspection

Inspect surface finish, appearance, defects. Verify coating/paint if applicable. Check for burrs, sharp edges. Verify marking and labeling.

Step 5: Functional Testing

Perform functional tests if applicable. Verify mechanisms operate correctly. Verify assembly with mating parts if applicable. Perform any special tests specified.

Step 6: Documentation

Complete FAI report. Include all inspection results. Include material certification. Include any test reports. Include production records. Review for completeness.

Step 7: Review and Approval

Review FAI results. Verify all characteristics conform. Identify any non-conformances. If non-conformances found: investigate root cause, correct process, produce new first article, repeat FAI. If all conform: approve for production. Obtain customer approval if required.

Step 8: Production Release

Release for production after FAI approval. Maintain FAI records. Use FAI as baseline for production inspection. Schedule next FAI if required (after changes).

FAI Documentation

FAI Report Content

Part identification: part number, part name, revision. Drawing: number, revision, date. Material: grade, specification, heat number, certification reference. Production: work order, date, quantity. Manufacturing process: method, equipment, parameters. Inspection results: all dimensions and tests. Measurement equipment: tools used, calibration status. Inspector: name, signature, date. Quality approval: name, signature, date. Customer approval: if required.

Dimensional Results Table

For each dimension: feature description, dimension ID (balloon number), nominal value, upper tolerance, lower tolerance, measured value, result (pass/fail). Organized by drawing view or feature type. Complete coverage of all drawing dimensions.

Material and Process Results

Material grade and specification. Material certification reference (MTC number, heat number). Special processes: surface treatment, welding, heat treatment. Process parameters: relevant production parameters. Process certification: welder qualification, WPS reference.

Non-Conformance Documentation

If any characteristic does not conform: describe the non-conformance, record specification and actual value, investigate root cause, document corrective action, plan re-inspection after correction.

FAI Standards

AS9102 (Aerospace)

Standard FAI form for aerospace industry. Three forms: Part 1 (Part Number), Part 2 (Product Definition), Part 3 (Characteristics). Required for aerospace parts. Comprehensive and structured.

General Industry

No single standard for all industries. FAI format may be: customer-specified, company-specific, based on industry practice. Key: all requirements verified and documented.

Customer-Specific FAI

Customer may specify: FAI format, content, approval process, submission requirements. Follow customer requirements when specified.

FAI Best Practices

Planning

Plan FAI before production starts. Ensure all resources available. Create inspection plan. Review drawing for completeness. Identify critical characteristics.

Measurement

Use calibrated equipment. Use appropriate measurement methods. Verify gauge R&R if needed. Take multiple measurements for critical features. Use CMM for complex geometries. Document all measurements.

Objectivity

Inspect objectively. Do not adjust results to pass. If non-conformance found: report it. Investigate root cause. Correct the process. Re-inspect.

Documentation

Document completely. Every dimension inspected. Every test performed. Every result recorded. Include all supporting documentation. Review for completeness before submission.

Communication

Communicate FAI results to all stakeholders. Engineering: design issues identified. Production: process issues identified. Quality: inspection results. Customer: FAI approval if required.

Common FAI Issues

Missing Dimensions

Problem: not all dimensions on drawing inspected. Cause: oversight, incomplete inspection plan. Prevention: use balloon method to identify all dimensions, create comprehensive inspection plan, review for completeness.

Inadequate Measurement

Problem: measurement tool not accurate enough. Cause: wrong tool selected, tool not calibrated. Prevention: select tool with adequate accuracy (10:1 rule), verify calibration, conduct gauge R&R.

Design Issues

Problem: design is not manufacturable as specified. Cause: design errors, unrealistic tolerances, missing specifications. Solution: work with engineering to resolve, modify design if needed, document deviations.

Process Issues

Problem: process cannot produce conforming part. Cause: inadequate process, wrong parameters, tooling issues. Solution: adjust process parameters, modify tooling, improve process.

Material Issues

Problem: material does not meet specification. Cause: wrong material supplied, material defect. Solution: verify material at receiving, obtain correct material, investigate with supplier.

Partial FAI

When Partial FAI is Appropriate

Design change affects only some characteristics. Process change affects only some operations. Only some characteristics need re-verification. Partial FAI covers affected characteristics only.

Partial FAI Requirements

Identify affected characteristics. Inspect affected characteristics. Reference previous FAI for unaffected characteristics. Document what changed and why partial FAI is appropriate. Obtain approval if required.

At Fulei Metal

Our FAI program includes: documented FAI procedure. Comprehensive inspection of all characteristics. FAI report with complete documentation. Material certification verification. CMM inspection for complex parts. Customer FAI format support. FAI approval process. FAI records maintenance. We perform FAI for every new product, ensuring that our manufacturing processes produce conforming parts from the first article, providing confidence to our global clients.

Full FAI or Partial FAI: How the Scope Is Decided

A first article inspection is not one fixed document. Its scope follows the change that triggered it, and getting that wrong costs money in one of two ways: an inspection nobody uses, or a gap that only surfaces once the parts are in service.

The choice below is made before anything is measured, because it decides both the inspection workload and how much of the lot remains unexplained afterwards.

What changedFull FAIPartial FAIWhen the partial route actually holds up
A new part, with no inspection historyEvery characteristic on the drawing, ballooned and numberedNot available – there is nothing to compare againstNever. A first article with no baseline is a full first article by definition
A revision that changes one feature familyAll characteristics, on the reasonable fear that something else movedOnly the characteristics the revision touchesWhen the earlier FAI is closed out, traceable, and was produced on the same process route
New tooling, new press, new fixtureAll characteristics that the tooling or fixture can influenceUsually the affected characteristics plus a safety marginOnly if the change can be shown not to reach the untouched characteristics
A shift of one operation to a different machineThe characteristics that operation produces, at minimumThe operation output plus the interface dimensions downstreamWhen the downstream operations are unaffected and the interface is re-verified
A tooling repair or a re-ground punchRarely needed in full, but the affected geometry yesThe geometry the tool producesWhen the repair restored the original geometry rather than changing it
The first run after a long gap in productionThe characteristics the process is least stable onThe characteristics that drifted before, if records existWhen the previous runs records identify a stable set to re-check

Partial FAI is not a discounted version of the same report. It is only defensible when a full FAI already exists, is closed out, and still describes the route the part is made on. If the route moved anywhere the report does not cover, the baseline is gone and the honest answer is a full inspection. Send the drawing with its revision history through the RFQ form and we will say which one applies before either of us spends time on it.

Frequently Asked Questions

How long does a first article report stay valid?

There is no fixed expiry in the way a certificate has one. It is event-driven: the report describes the process route as it stood on the day it was signed, so it stays valid for as long as that route is unchanged. A new machine, a repaired tool, a change of material supplier or a revision all shorten it. This is also why we record the route on the report rather than only the results.

Who pays for the first article?

It is part of the set-up, so on a new part it is normally built into the price rather than invoiced separately, and on a repeat part it is not charged again unless the scope changes. What matters more than who pays is that the scope is agreed in writing first – an inspection plan written after the fact tends to describe what was measured rather than what mattered.

What happens if the first article fails?

It does not ship, and it is not shipped as “pending approval” either. The deviation is measured, the cause is traced to the process rather than the part, the process is corrected and a new first article is produced against the same plan. Shipping a failed first article on a promise is how a whole lot becomes suspect – once one part is known to be out of specification, every part made on that set-up carries the same question.

Questions about a specific part are usually faster to answer against the drawing — send it through the route below.

Conclusion

First Article Inspection is a critical step in validating new products and processes. At Fulei Metal, our thorough FAI process ensures that we can produce parts that meet all requirements before entering production, preventing quality issues and providing confidence to our international clients from the very first part.