HVAC Enclosures, Built to Your Drawing

Fulei Metal builds HVAC enclosures and heat-pump cabinets from customer drawings only. Inverter cabinets, rooftop and condenser housings, buffer-tank claddings, air-handling-unit panels, chiller enclosures and controller boxes — in stainless steel 304/316, aluminium 5052/5754/6061 and carbon steel — in a 2,500 m² plant in Ningbo, China, since 2016. You send the drawing; we cut, bend, weld, finish, assemble and pack it.

If you are looking for a catalogue HVAC box in a standard size, we are the wrong supplier — say so early and we will point you to a stockist. What we do is the part that has no catalogue number: the cabinet that has to fit your unit layout, carry your cutouts, take your mounting plate and survive being mounted outdoors for ten years.

What we build for HVAC and heat-pump systems

These are the enclosure types we are asked to quote most often on HVAC and heat-pump projects. None of them is a stock item — every one is built to the drawing you send.

TypeWhat the installation asks of itWhat the drawing usually has to settle
Inverter and control cabinets for air-source heat pumpsOutdoor siting, heat from power electronics, sealed vs. vented conflict, public accessVentilation path and filter, compartment separation, lock selection, UV-stable finish
Rooftop and condenser unit housingsUV, driving rain, thermal cycling, weight on the roof structureWall thickness versus weight, drain and breather arrangement, coating system
Buffer-tank and cylinder claddingsCondensation on the cold surface, touch-temperature limits, clean appearanceInsulation cavity, ventilation behind the skin, radius on exposed edges
Air-handling-unit (AHU) panels and framesLarge flat areas that bow, hygiene requirements, service accessStiffener layout, removable panels, sealed joints, gasket groove
Chiller and VRF control enclosuresCorrosive plant-room atmosphere, vibration from compressors, restricted service spaceCoating for the atmosphere, cable-entry position, internal clearance for the door
Thermostat and controller housingsHandled and cleaned by occupants, small batch sizes, cosmetic finishGrain direction on brushed stainless, concealed fixings, IK rating on the face

Being clear about the boundary saves both sides time. If a project needs something we do not run, we say so in the first reply instead of quoting around it.

What we build, and what we do not

In scopeOut of scope
Enclosure bodies, doors, mounting panels, back platesCastings and forgings
Cutouts for connectors, glands, vents, displays, switchesInjection-moulded parts
Welded frames and chassis for HVAC equipmentPure machining work (lathe/mill only jobs)
Pre-installed hardware: DIN rail, locks, hinges, fans, filtersElectrical wiring and PCB assembly
Surface finishing and assembly to your specificationCertification of the finished equipment
Export packing with photographs before shipment—

Material and finish for outdoor HVAC

Most HVAC enclosure failures outdoors are material or finish failures, not weld failures. We ask for the installation environment and the chemical exposure before we quote, because the difference between a cabinet that lasts two seasons and one that lasts ten is a few drawn details and the right coating.

EnvironmentWhat it does to the enclosureWhat we would build it from
Inland, dry, shelteredLittle — cost and assembly time dominateGalvanised or carbon steel, powder coated, IP54
Coastal or de-icing saltChloride pitting at welds and cut edgesStainless 316, or 304 with sealed and passivated edges
Washdown or pool / spa surroundingsContinuous moisture and chemicalsStainless 316, electropolished; sealed gasket groove
Weight-sensitive rooftop or unitEvery kilogram costs structureAluminium 5052/5754, anodised or powder coated
High-visibility architecturalFinish and grain direction are judged up closeBrushed stainless, grain controlled, edges blended

We are not an in-house coater. Brushing and mirror polishing are done in our own shop; passivation, electropolishing, anodising, zinc plating, hot-dip galvanising and powder coating are applied on audited partner lines that we specify and inspect. Material is verified by mill certificates and spark/magnetic sorting, with third-party chemical analysis available when the specification calls for it.

Condensation, drainage and thermal management

A sealed cabinet and a cabinet that needs to breathe are opposite designs, and HVAC enclosures sit right on that line. A heat-pump inverter cabinet wants to stay sealed against rain but the electronics inside want to shed heat; a cold buffer-tank cladding wants a vented cavity so it does not sweat onto the floor.

We do not rate or certify the ingress protection of a finished cabinet — that is a sample-test result, not a promise we can make for your drawing. What we do is build the drainage, breather, gasket groove and coating system that your drawing specifies, and we flag the conflict early if a drawing asks for both “fully sealed” and “natural convection cooling” without settling how.

Design intentWhat has to be in the drawing
Sealed, IP-rated outdoorContinuous gasket groove, door overlap, drip edge, sealed cable entries
Vented, convection-cooledFiltered louvre or breather, drain path, separation of hot and cold zones
Cold-surface claddingVentilation cavity, insulated backing, touch-temperature limit

North America: NEMA, UL and cETL

A large share of HVAC enclosure demand is North American, where NEMA ratings and listing requirements are the language buyers speak. We build cabinets to drawings that reference NEMA 3R / 4 / 4X enclosures and equipment safety standards such as UL 60335-2-40; NEMA 4X maps to roughly IP66 in corrosion protection. We do not certify or list the finished equipment — that responsibility sits with the integrator — but we build the enclosure to the drawing and the referenced standard, and we document the materials and finishes we used.

What we run in-house

We are a fabrication shop, not an assembly house. In our own 2,500 m² workshop in Ningbo we run three fibre lasers (two at 3,000 W and one at 6,000 W), four CNC press brakes at 250 t with a 3,000 mm bed, and ten welding stations. We handle carbon steel from 0.5 to 18 mm, stainless from 0.5 to 15 mm and aluminium from 0.5 to 10 mm. Brushing and mirror polishing are in-house; finishing that needs a line (anodising, plating, powder coating) is specified and inspected on audited partner lines.

Our quality system is documented to ISO 9001; we do not hold a third-party ISO 9001 certificate, but our processes are audited — TÜV under number MIC-ASI243729 and Bureau Veritas under MIC-ASR263630, both verifiable on request. We have quoted buyers in North America, Europe, Japan and Korea and shipped to 30+ countries.

Send your drawing — here is what happens next

We quote from drawings, not from a description in an email. Roughly four in ten quotations stall because the drawing never arrives, so the single most useful thing you can send us is the file. A complete package does not need to be a finished manufacturing drawing — it needs enough for us to price the part and flag the risks.

IncludeWhy it matters
Overall dimensions and the critical ones called outSets the blank size, the brake capacity and the price
Material and grade (e.g. 304, 316, 5052-H32)Drives corrosion behaviour and cert cost
Cutouts, holes and their positionsLaser time and any special tooling
Finish and environmentDecides coating system and inspection
Tolerance intent (or “per ISO 2768-m”)We apply ISO 2768-1 m-class defaults where nothing is called out
Mounting, gasket and hardware notesPre-installed hardware we can source and fit

If you only have a sample, a photo set or a sketch, we can still work from it — see our notes on what drawings are needed for a quotation and on engineering review and DFM. Simple samples run in 3–7 days, a complex first article in 15–20 days, and mass production in 25–35 days after the sample is approved.

Frequently asked questions

Do you make standard catalogue HVAC enclosures?

No. We build to customer drawings only. If you need a stock heat-pump or HVAC enclosure in a standard size, we are the wrong supplier and will say so — we would rather point you to a stockist than quote a part we cannot make competitively.

What materials do you use for outdoor heat-pump cabinets?

For most outdoor units we use stainless 304 or 316, or aluminium 5052/5754 when weight matters. Coastal or de-icing sites get 316 with sealed and passivated edges. Carbon or galvanised steel with powder coat is fine for sheltered inland sites. The choice follows the environment you tell us about, not a default.

Can you meet UL or cETL requirements?

We build the enclosure to drawings that reference NEMA 3R/4/4X and equipment standards such as UL 60335-2-40, and we document the materials and finishes. We do not certify or list the finished equipment — that is the integrator’s responsibility — but we can build to the referenced specification and supply the material and finish records.

How do you handle condensation inside a sealed cabinet?

We build the drainage, breather, gasket groove and coating system your drawing specifies. If a drawing asks for both “fully sealed” and “natural convection cooling” without settling how, we flag the conflict before cutting metal rather than after. We do not rate the ingress protection of the finished cabinet; that is a sample-test result.

What do I need to send for a quote?

A drawing or a clear sketch with overall dimensions, material and grade, cutouts, finish, and tolerance intent. You do not need a finished manufacturing drawing — see our guide to what drawings are needed for a quotation. The more the file tells us, the tighter the price.

What are your lead times?

Simple samples run in 3–7 days, a complex first article in 15–20 days, and mass production in 25–35 days after the sample is approved. Tooling for pre-installed hardware and any outsourced finishing are scheduled into that window.

Related enclosure pages

Related: Typical project profile — is Fulei the right shop for your part?

Scroll to Top