Products / Home & Living / Laundry Drying Rack
Home & Living

Laundry Drying Rack

SKU: FL-HO-012

Foldable stainless steel drying rack. Indoor/outdoor use.

MaterialSUS 304 stainless steel + aluminum
Manufacturing ProcessTube bending + cutting + assembly
Surface FinishBrushed stainless
Tolerance±0.5mm
Dimensions1500×600×1000mm (open)
Capacity15kg laundry
FoldableYes
Weight5kg
MOQ100 units
Lead TimeQuoted after drawing review and process confirmation
Sample TimeQuoted after drawing review and process confirmation
Sample FeeUSD 100
Price RangeUSD 45-80/unit
ApplicationsHome, apartments
ComplianceREACH
Export MarketsUSA, Germany, UK

How This Laundry Drying Rack Is Fabricated and Checked

A folding drying rack is a structure with a mechanism, and the mechanism is where the product lives or dies. Frames and bars are straightforward tube work. The folding joint has to lock, unlock with one hand, and hold a load of wet laundry at the end of a lever arm – which is a much harder question than the static load figure suggests.

Tube is bent over a mandrel so the section stays round through the bend, the same tube bending setup used for the other frame products here.
StageWhat happensWhat is verified before the job moves on
Tube cutting and end formingStainless and aluminium tube is cut and the ends are formed for the joints. Cut lengths are set from the finished geometry, not from the outside dimensions.Cut length is checked against the joint centres, because the finished size is the assembly dimension and it is not the sum of the parts.
BendingFrame tubes are bent on a mandrel bender so the section stays round through the bend.Wall thinning on the outside of each bend and ovality are checked. A bend that has flattened will still fit a joint but will be weaker exactly where the frame carries its load.
AssemblyFrame tubes are joined through formed end details with riveted or bolted connections, and the folding joints are pinned. There is no welding on this product, which is why the joinery has to be right – there is no weld to take up an error in tube length.Joint alignment is checked across the whole frame, and each joint is checked for movement under load. Two frames that are each square but not aligned to each other will fold unevenly, and that shows up as a rack that needs two hands to close.
Mechanism checkThe folding joint is cycled and its locking position is checked.The lock has to hold under load at the furthest point of the frame, not in the middle. This is the test that catches most mechanism problems, and it is done before finishing rather than after.
FinishingStainless is brushed; aluminium is left natural or anodised. Mixed-material assemblies are separated at any point where the two metals touch.Contact points between stainless and aluminium are checked for isolation. Two different metals in contact and wet is a corrosion cell, and it works quietly until the rack is two years old.
Load testA representative unit is loaded to its rated capacity at the end of the frame, not in the centre.The frame is checked for permanent set after the load is removed. A rack that springs back has passed; one that has taken a set has not, and no amount of inspection later will help.
PackingThe rack is folded, wrapped and packed with the joints protected.Each packed unit is checked as it folds flat. A rack that will not fold to the packed size is a packing problem created in fabrication.
A finished unit in its export carton at Fulei Metal, wrapped so that the surface cannot be marked in transit. Folding products are packed in their folded state because the packed size is what decides the shipping cost, and it has to be confirmed on the assembled unit.
A finished unit in its export carton at Fulei Metal, wrapped so that the surface cannot be marked in transit. Folding products are packed in their folded state because the packed size is what decides the shipping cost, and it has to be confirmed on the assembled unit.

Changes Laundry Drying Rack Can Absorb Without New Tooling

The frame is tube and cut lengths, so size is open. Anything that touches the mechanism is the part to discuss early.

What can be changedWhat it affectsWhat it does not affect
Overall size and drying lengthCut lengths and the frame geometryThe folding joints, if the joint centres stay the same
Number of drying barsCut layout and the frame spacingThe folded size
Folded sizeJoint geometryThe open size
Aluminium or stainless for each partWeight, cost and how the joints are isolatedThe mechanism design
Anodised or natural aluminiumSurface treatment routeThe frame

FAQ on Laundry Drying Rack

What stops the frame from collapsing when it is loaded?

The folding joints, and they are tested under load at the worst position – the far end of the frame, where the moment on the joint is greatest. Loading the middle of the rack tells you very little because that is the easy case. The joints are also checked through a folding cycle before finishing, because a joint that binds will eventually be forced, and forcing it is what breaks it. If you have a target figure for a single side-loaded bar, tell us and it will be tested that way.

Is there a problem mixing aluminium and stainless in one frame?

There can be, and it is a slow one. Aluminium and stainless in direct contact in a damp environment form a corrosion cell, and the aluminium is the part that gives way. The answer is not to avoid the mix – the combination is chosen because aluminium keeps the weight down and stainless keeps the strength where it is needed – but to isolate the contact points with a barrier or with fasteners that do not set up the same couple. Which parts are which material is settled at design stage.

What does a 15 kg capacity mean in practice?

It is the rated static load, and wet laundry does not apply its load the way a test weight does. Wet washing bunched at one end of the rack loads the outer bar and its joint far harder than the same weight spread evenly. That is why the load test is carried at the end of the frame. In use, the practical guidance is to spread the load rather than to keep to a total figure, and if your market expects a higher figure, say so at quotation because it changes the joint design rather than the frame.

Send the open size and the folded size you need, the drying length, and any load figure your market expects, and say whether the frame should be stainless, aluminium or a mix. The joint design follows from those answers. Send your specification for a quotation.

Packed size is confirmed as each unit is folded and the carton is specified around it – see the packaging guide.

The Fold Mechanism Is the Only Part on This Rack That Wears Out

A drying rack is a static frame that does one moving thing. The tube and the welds will outlast the product; the folding joints will not. Every fold cycle works the same few pivot points, and a pivot is a pin in a hole in thin material, which is the arrangement that wears fastest in any mechanism. What makes it worse here is that the wear is load-dependent: the rack is folded and unfolded while it is wet, heavy and usually one-handed, so the pivot takes side loading as well as rotation.

  • Pivot holes should be formed rather than drilled where the section allows, because a formed hole has a work-hardened wall and a drilled hole in 1.0 mm material does not.
  • A riveted pivot is permanent and a bolted one is serviceable. On a product this light, a bolt that can be tightened once by the owner is worth more than a joint that stays perfect until it does not.
  • Check the folded thickness if the rack is going into a cupboard. It is decided by the tube diameter and the hinge offset, and it is the dimension people forget to specify.

Bend Radius on Tube: Where a Drying Rack Cracks Years Later

Tube bending looks like a shaping operation, but on thin-wall stainless it is the operation most likely to leave a latent defect. Bend a tube too tightly for its wall thickness and the outside wall thins, and the inside wall wrinkles. Neither is visible once the rack is brushed and assembled, and both are where a frame that has carried 15 kg without complaint for two years suddenly gives way at a corner. The safe radius is a function of the tube diameter and the wall, not a number that carries over from a different section.

We spec the bend radius from the tube we are actually using and we keep it consistent between the first sample and the production run, because a radius that was achievable on a bending trial and a radius that holds across a batch are not always the same thing. If your rack mixes aluminium and stainless sections, say so at quote stage – the two materials do not bend to the same radius and they do not share a finishing line. Lead time is quoted after drawing review and process confirmation.

Payment Terms

How a project is paid for is agreed before production starts, and the structure that applies to your order is stated on the quotation and on the order confirmation, so there is no ambiguity later.

  • 30% advance payment with the order and the 70% balance before shipment — our standard structure.
  • 70% advance payment with the order and the 30% balance before shipment — used for some projects.
  • 100% payment in advance before production starts — used for some projects.

If your finance team works to a fixed structure, say so in the first enquiry and we will confirm what applies to your order before you commit. Request a quotation.

Questions buyers ask before sending drawings

The questions that come up most often before a project starts, answered the way we answer them by email.

What do you need from me to quote Laundry Drying Rack?

2D drawings as PDF, DWG or DXF, or 3D files as STEP, IGES or SolidWorks, together with material grade, sheet thickness, surface finish, quantity and destination country. If the drawing is not finished yet, send a photo, a sketch or the existing part instead — we review what can be measured from it and reply with the questions that still need answering.

How long does a quotation take?

Enquiries are answered within one business day. Simple laser-cut and bent parts are quoted within 24 hours. Welded frames, assembled units and multi-part structures are quoted after the drawing review and process confirmation, and the date is confirmed in our reply.

Is there a minimum order quantity?

Prototypes are made from a single piece and small batches of 10–50 pieces are routine. Prototype, first batch and repeat volume are quoted together so the numbers stay consistent as the project scales.

Can you work from a sample or a photo if I have no drawing?

Yes. Send the part itself, clear photographs with a rule or caliper in frame, or a dimensioned sketch. We measure what can be measured, list what is still undefined, and confirm it with you before production.

Send Your Drawings

Need a Similar Part?

Most enquiries that start on a page like this are not an order for Laundry Drying Rack — they are a search for a factory that can make something like it. Send us your drawing, 3D model or sample and we will review the manufacturing process and the quotation requirements, then come back with a process plan, a price and a lead time.

We work from 2D drawings, STEP / DWG / DXF / PDF files, or a physical sample if that is all you have.

Send Your Drawings

No complete drawings yet? Describe the part, send photos or a sketch, or send a sample — we can start from there. Discuss your project.

Trade Terms and Delivery

We quote under the standard Incoterms your logistics team already works with, and build the packing and documentation around the one you choose.

  • EXW — you collect from our Ningbo facility and run export clearance through your own forwarder.
  • FOB Ningbo — we deliver to the vessel at Ningbo port and handle export clearance.
  • CIF — we cover carriage and insurance to your named destination port.
  • DDP — we handle carriage, insurance, import clearance and duties through to your door.

Send your destination country, target delivery date and preferred trade term together with the drawing. Request a quotation.

Quotation Time

We quote from your drawings. How long that takes depends on what the part asks for:

  • Simple parts — quoted within 24 hours. Laser-cut blanks and bent components, supplied with complete 2D or 3D drawings. Mon–Fri, GMT+8.
  • Complex assemblies — quoted after the drawing review. Payment kiosks, multi-part welded frames, enclosures with purchased hardware, or anything needing a coating or assembly trial. We confirm a quotation date once the scope is clear.

Production lead time is quoted separately, after drawing review and process confirmation. Send your drawings.

What stands behind this quotation

  • Manufacturing since 20162,500 m² Ningbo plant — 3 laser cutting machines (including newer TRUMPF), 4 CNC press brakes and 10 welding stations.
  • Shipped to more than 30 export marketsEnclosures, cabinets and formed parts supplied to OEM buyers across Europe, North America and Asia.
  • 123 documented product casesMedical device housings, HVAC and heat pump enclosures, agricultural and livestock equipment, industrial hydraulics, material handling trolleys and EV charging cabinets.
  • Factory evidence you can checkTUV Rheinland audit reference MIC-ASI243729 and Bureau Veritas reference MIC-ASR263630 available for buyer review under NDA.

Before you send drawings: an NDA is signed on request · first-article inspection is carried out before a batch continues · pricing is staged from prototype quantity to repeat volume · pre-shipment photos and packing records are prepared when the project needs them.

Scroll to Top