How to Write a Sheet Metal Fabrication RFQ: A Buyer’s Checklist
Every week, fabrication shops receive requests that cannot be quoted on the spot — a photo with no dimensions, a drawing with no quantity, a “make me something like this” note. The back-and-forth that follows costs both sides days. A well-structured RFQ does not require engineering expertise; it requires the right information in one place. This guide gives buyers a practical checklist so the quote you receive is fast, accurate, and comparable across suppliers.
The Five Fields Every Sheet Metal RFQ Needs
- Part geometry / drawings — what the part actually is.
- Material — grade or at least the application.
- Finish and surface treatment — the look and the environment.
- Quantity and staging — prototype, first article, or production.
- Commercial terms — delivery destination and Incoterms.
Miss one of these and the quote either comes back with a caveat or stalls while the shop asks for the missing piece. Consolidating all five into the first message is the single highest-leverage thing a buyer can do.
Drawings — The #1 Cause of Quote Delays
The biggest source of delay is an incomplete drawing package. A usable RFQ includes:
- A dimensioned 2D drawing (PDF/DWG) or a 3D model (STEP/IGES), plus flat patterns for laser-cut parts where available.
- Critical dimensions and tolerances called out, not assumed.
- Bend lines and bend radii for formed parts.
- Hole patterns, threads, and any welded features shown explicitly.
When a buyer sends only a photograph or a rendered concept, the shop must reverse-engineer the part. That is possible, but it adds a clarification round and introduces risk. A recurring pattern we see: an inquiry arrives with a clear part image but no source file, then stalls while we wait for the drawing. Another common case: drawings exist, but quantity and finish are missing, so the quote cannot be finalized. Putting everything in the first message removes that stall.
Material, Finish, and Tolerance — Specify, Don’t Assume
Material: name the grade. For stainless, SUS304, SUS316, or SUS430 cover most enclosures and brackets; for aluminum, 5052, 5754, or 6061. We work carbon steel from 0.5–18 mm, stainless from 0.5–15 mm, and aluminum from 0.5–10 mm. If you only know the application — for example, “outdoor cabinet” — say so; the shop can recommend a grade rather than guess.
Finish: brushed and mirror finishes are done in-house; anodizing, passivation, plating, and powder coating are handled through qualified partners. State the target look and the environment (indoor, outdoor, washdown, IP54–66) so the finish and sealing approach match.
Tolerances: call out the few dimensions that truly matter. A blanket “tight tolerance everywhere” raises cost without adding value. Functional fits, hole positions, and mating surfaces are where tolerance matters most.
Quantity, Lead Time, and Logistics
Volume drives process choice. A prototyping run of a few pieces is quoted differently from a 1,000-unit production order. Typical windows we quote: prototyping 3–7 days, complex first articles 15–20 days, and production 25–35 days after sample approval. These are planning figures, confirmed against your drawing.
Stage your order if possible: approve a first article, then release volume. This is especially useful for buyers ordering a custom series — for example, a run of industrial trolleys — where a verified sample prevents a costly batch error. For buyers who need a ready-made cart or trolley series rather than a custom fabrication program, see our dedicated site doingmetal.com.
Include Incoterms and destination so the quote reflects landed cost, not just ex-works price.
How a Complete RFQ Protects Your IP
Buyers often worry about sending drawings to an overseas shop. Drawings are treated as confidential by default — used only for your own project, never shared, resold, or reused. Material traceability and mill certificates can be supplied on request, and quality is documented to ISO 9001. Independent verification is available: our management system is audited by TÜV (MIC-ASI243729) and BV (MIC-ASR263630), verifiable under NDA. [需确认: whether mill test certificates are issued per heat or per batch — confirm before promising a specific format to a regulated-industry buyer.]
Frequently Asked Questions
Do I need a CAD file, or is a sketch enough?
A dimensioned drawing or 3D model is strongly preferred for an accurate quote, because it removes interpretation. A clear sketch with key dimensions can start a conversation, but expect a clarification step before a firm number.
What tolerance can I expect on laser-cut and bent parts?
General commercial tolerances apply unless you specify tighter ones on critical features. We confirm achievable tolerance against your drawing during quoting — we do not quote a number we cannot hold.
Can you help if I only have a concept, no drawings?
Yes. We can engineer a part from a sample, a photo with dimensions, or a functional description. The more defined the spec, the faster the quote.
How fast can I get a first sample?
Prototyping typically runs 3–7 days; a complex first article 15–20 days; production 25–35 days after sample sign-off. These are planning ranges, confirmed per project.
How are parts measured and inspected?
In-house we use digital calipers, micrometers, digital height gauges, a granite surface plate, and radius, thread, pin, weld, and plug gauges, plus a surface roughness tester and custom go/no-go fixtures. For high-precision 3D dimensional verification, we use an outside metrology lab.
Is my drawing kept confidential?
Yes — confidential by default, used only for your project. [需确认: confirm the exact data-handling commitment you want published; current site language is “confidential by default.”]
Buyer’s RFQ Checklist
- Dimensioned drawing or 3D model attached
- Material grade named (or application described)
- Finish and environment specified (indoor / outdoor / IP rating)
- Critical tolerances called out
- Quantity and staging stated (prototype / first article / production)
- Incoterms and delivery destination included
- Any marking, threading, or assembly requirements noted
- Target timeline shared
Ready to Send Your RFQ?
Include the fields above and our team will return a staged, transparent quote. We serve buyers across Industrial Automation · EV Charging · Medical · HVAC · Semiconductor · Robotics · Renewable Energy. For a ready-made cart or trolley series instead of a custom program, visit doingmetal.com. Start your request at /contact/.
What stands behind this quotation
- Manufacturing since 20162,500 m² Ningbo plant — 3 laser cutting machines (including newer TRUMPF), 4 CNC press brakes and 10 welding stations.
- Shipped to more than 30 export marketsEnclosures, cabinets and formed parts supplied to OEM buyers across Europe, North America and Asia.
- 123 documented product casesMedical device housings, HVAC and heat pump enclosures, agricultural and livestock equipment, industrial hydraulics, material handling trolleys and EV charging cabinets.
- Factory evidence you can checkTUV Rheinland audit reference MIC-ASI243729 and Bureau Veritas reference MIC-ASR263630 available for buyer review on request.
Before you send drawings: project confidentiality is default · first-article inspection is carried out before a batch continues · pricing is staged from prototype quantity to repeat volume · pre-shipment photos and packing records are prepared when the project needs them.